From single pieces to full crew runs, Seven Oaks gets embroidered gear with honest pricing and a 5 to 7 day door-to-door timeline.
Digitized stitching for hats, polos, and jackets. A left-chest logo runs 5,000 to 8,000 stitches and reads professional in any room. For Seven Oaks, that comes with published pack pricing and door delivery in 5 to 7 business days.
Seven Oaks covers 7.7 square miles of South Carolina, and delivery reaches every address in it on the standard 5 to 7 day window. If your people are spread out, that is fine: St. Andrews, SC (2 mi), Oak Grove, SC (4 mi), West Columbia, SC (5 mi) sit close enough that one order can outfit all of them. For the military community, Fort Jackson sits about 13 miles away, well inside our normal unit-order routes.
The whole process runs remote: rough idea in, free designer-built proof back, written approval, and finished gear delivered to Seven Oaks.
A typical week of embroidery orders from this corner of South Carolina mixes Seven Oaks crews with neighbors like St. Andrews, 2 miles over, all running through the same designer, the same proof cycle, and the same tracked delivery.
Sewn or iron-on patches with correct insignia use, matched to the era when the design calls for it. Youth and adult cuts run side by side in the same pack at the same price structure.
Duffels, totes, and range bags with stitched identity that outlasts any print. The second order takes two minutes because the first one is archived down to the thread color.
The raised-foam look: 3D puff stitching on structured fronts. Packs mix garment colors freely, so squads, shifts, or grade levels can each get their own.
Front-panel logos digitized in-house and stitched onto trucker and baseball styles. We handle the art, the sizing spread, and the deadline. You handle handing them out.
Left-chest logos that make a crew look like a company, on garments people keep wearing. Nobody chases an order here. Your contact tells you where it stands before you have to ask.
Outerwear embroidery digitized per fabric, from chest marks to full backs. Reorders match the first run exactly because we keep your art and specs on file.
Serving the military community is not a marketing line here, it is the operating system. Seven oaks customers deal with one accountable person, get dates that mean something, and receive work held to a uniform standard.
The same discipline applies inward: an unrealistic date or a design that will not print well gets flagged before you commit, not explained after.
Upload art or add text in the Design Lab, set sizes and quantities, and the full estimate, shipping included, is on screen before you give anyone your email.
Start from the garment and the rest follows. Among Seven Oaks customers, these three blanks carry most of the orders, each designable online on its real photos.
Staff uniforms default to the embroidered crew for one reason: it outlives everything else in the rotation. The proof comes first and it is free, so what arrives is exactly what you signed off on.
Left chest embroidery on a heavy cotton tee reads uniform without feeling corporate. Packs mix garment colors freely, so squads, shifts, or grade levels can each get their own.
Stitch a chest mark on this 8.0oz hoodie and watch it become the most-kept item of the season. Rush timelines get quoted honestly. If we cannot hit the date, we say so before you pay a cent.
Half the orders we take begin as a phone photo of a sketch, an old shirt, or a sentence describing the idea. A designer turns that into print-ready vector art at no charge, sends the proof inside 24 hours, and revises it until you sign off in writing. Nothing is produced before that signature, which is why what shows up matches what you expected.
Prefer hands-on? Build the design yourself in the Design Lab on real product photos, with the running price on screen while you work.
Budget planning for Seven Oaks customers starts with real numbers. This is our light cotton tee pack pricing with the front print already included.
| Pieces | Total | Each | Ship | Back print add |
|---|---|---|---|---|
| Pack of 10 | $180 | $18 ea | $18 | $4 ea |
| Pack of 15 | $250 | $16.67 ea | $18 | $4 ea |
| Pack of 20 | $320 | $16 ea | $20.99 | $4 ea |
| Pack of 25 | $375 | $15 ea | $20.99 | $3 ea |
| Pack of 50 | $700 | $14 ea | $22.99 | $2 ea |
| Pack of 100 | $1200 | $12 ea | FREE | $2 ea |
Three add-ons exist and all are flat per piece: the back print at the table rate ($3 from 25 pieces, $2 from 50), the oversized front at $3 or $2 depending on quantity, and extended sizes at $6 or $4. Nothing else gets added. The Design Lab applies every rule automatically, and the written quote confirms the total before anything is charged.
Two doors in: the quote form if you want a person on it immediately, or the Design Lab if you want to see it on the garment first. Either way, unfinished ideas are the expected input.
One day later the proof is in your inbox: your art, your garment, your colors, at true print scale. Revisions never cost a cent.
Production waits for one thing only: your written sign-off on the proof. That signature is the contract for exactly what prints.
Five to seven business days covers printing and delivery. Tight timeline? Rush gets a truthful quote, not a hopeful one.
Art, thread colors, and size history stay archived, so the next season run starts with one email.
Delivery to Seven Oaks addresses follows one simple clock: 5 to 7 business days including production, with tracking from the moment it leaves. Hit 100 pieces and the shipping line drops to zero.
Boxes get counted twice against the roster before they seal, and the tracking number reaches you the day of pickup. Damage or shortage claims are our expense and our rush.
Best case: vector art (AI, SVG, EPS, PDF). Very good case: a 300 DPI transparent PNG. Worst case: a screenshot, which our designers redraw at no charge anyway.
We do, at the same pace as domestic orders. Deployed and overseas service members at APO and FPO addresses are covered alongside all 50 states.
Completely. Build the design in the Design Lab and the full order total sits on screen the whole time; no email, no call, no waiting.
The standard clock is 5 to 7 business days covering both production and delivery. Many orders can run faster; name the date and we will confirm or decline honestly.
Yes, and it costs nothing with your order. Send a sketch, an old logo, or just the idea, and a designer sends a print ready proof within 24 hours.
Absolutely. Bulk is where pack pricing shines, and big mixed-size runs ship counted against your roster with a single person accountable for the date.
More answers on the full FAQ page.
Zoom out to embroidery across South Carolina, back to the Seven Oaks hub, or into the embroidery deep dive. Other services in Seven Oaks: Screen Printing, DTG and DTF Printing, Sublimation, Banners and Signs, Custom Design.
A designer proofs your art free within 24 hours, and production waits for your written approval. Every pack price is already published.