Custom sublimated gear for Shirley businesses, schools, teams, churches, and crews. Proofs in 24 hours, delivered in 5 to 7 days.
Shirley crews order sublimated gear from us because the numbers are public and the process is simple: free design help, a written proof within 24 hours, and delivery to any Shirley address in 5 to 7 business days.
From one end of Shirley to the other, 0.1 square miles, the shipping promise does not change: 5 to 7 business days, tracked. The same run covers the neighboring communities too: Twin Grove, IL (5 mi), Bloomington, IL (7 mi), Heyworth, IL (7 mi) all order from the same shop at the same published pricing. Rock Island Arsenal, around 108 miles from Shirley, anchors the local military community we print for every week.
The whole process runs remote: rough idea in, free designer-built proof back, written approval, and finished gear delivered to Shirley.
A typical week of sublimation orders from this corner of Illinois mixes Shirley crews with neighbors like Twin Grove, 5 miles over, all running through the same designer, the same proof cycle, and the same tracked delivery.
Dedication flags and display pieces printed in full color on polyester. Youth and adult cuts run side by side in the same pack at the same price structure.
The retail touches: printed neck labels and interior branding. The proof comes first and it is free, so what arrives is exactly what you signed off on.
Edge-to-edge color dyed into the fabric, so the print can never crack or peel. Ask for the honest option and you get it, even when it is the cheaper one.
Rosters, numbers, and sponsors all print in the same pass at the same price. One point of contact owns your order from first proof to delivery confirmation.
Performance gear that still performs: the print adds zero weight and zero stiffness. Rush timelines get quoted honestly. If we cannot hit the date, we say so before you pay a cent.
Custom patterns and camo concepts printed edge to edge. Deadlines get treated like formation times, not suggestions.
We print for units, veterans, and military families every day, and the discipline transfers. Shirley customers get straight answers on dates, a named person on their order, and work we would put our own name on.
Part of the job is refusing bad orders. When the art, the garment, or the date is wrong, saying so before you pay is the service.
Upload art or add text in the Design Lab, set sizes and quantities, and the full estimate, shipping included, is on screen before you give anyone your email.
The right blank depends on budget, season, and how hard the gear will be worn. For Shirley customers, these three earn their keep.
Sublimated accents with embroidered marks make a hoodie that looks like team store product. Start from a napkin sketch if that is what you have. Turning rough into print ready is the job.
The widest, boxiest blank we stock, which is exactly what edge-to-edge concepts need. Nobody chases an order here. Your contact tells you where it stands before you have to ask.
Budget practice gear: standard tee, sublimated numbers, done. Ask for the honest option and you get it, even when it is the cheaper one.
Every order includes the design team. They rescue low-resolution logos, invent art from plain descriptions, and keep insignia and period typography accurate when the concept demands it. Twenty-four hours after you send the idea, the proof is in your inbox; as many revisions as it takes come free, and your written sign-off is what starts the presses.
Or open the Design Lab and lay the design out yourself, priced in real time on the exact blank.
Budget planning for Shirley customers starts with real numbers. This is our light cotton tee pack pricing with the front print already included.
| Order size | Pack total | Cost per piece | Freight | Back side |
|---|---|---|---|---|
| 10 pieces | $180 | $18 ea | $18 | $4 ea |
| 15 pieces | $250 | $16.67 ea | $18 | $4 ea |
| 20 pieces | $320 | $16 ea | $20.99 | $4 ea |
| 25 pieces | $375 | $15 ea | $20.99 | $3 ea |
| 50 pieces | $700 | $14 ea | $22.99 | $2 ea |
| 100 pieces | $1200 | $12 ea | FREE | $2 ea |
Options price per piece: back prints at the listed rate (falling to $3 at 25 and $2 at 50), oversized full-body fronts at $3 under 25 pieces or $2 above, and 2XL-plus sizes at $6 under 25 pieces or $4 above. Every heavier garment keeps this same pack shape at its own numbers, and the Design Lab totals it live while you build.
Send the idea through the quote form or build it yourself in the Design Lab. A napkin sketch photographed on a phone counts, our designers have built full unit runs from less.
A real designer, not an algorithm, sends your proof within 24 hours. You change it as many times as it takes to be right.
Your written approval is the gate. Until it exists, nothing prints; once it exists, exactly that design prints.
Approval to doorstep runs 5 to 7 business days as the default, faster when rush is booked and honestly refused when it cannot be.
Your art and specs stay on file, so reorders match the first run exactly, down to the ink.
Every order ships tracked to Shirley addresses with standard production plus shipping at 5 to 7 business days. Free shipping kicks in at 100 pieces, and pack shipping rates below that are published, not surprises at checkout.
Orders ship boxed and counted against your size roster, with tracking sent the day they leave. If anything arrives short or damaged, photograph it and send it over, and we correct it at our cost.
Included with every order: a designer turns whatever you send into print-ready art, proofs it within 24 hours, and revises free until approved.
Large runs are the core business: hundreds of pieces, mixed sizes, multiple colors, one named contact who owns it from first proof to the delivery scan.
Sizes 2XL and up add $6 per piece under 25 total pieces, or $4 per piece at 25 or more. The Design Lab includes it in your estimate automatically.
Due to custom orders, all work is finalized and no returns are accepted. Double check sizing and artwork before submitting your order. Every order gets a free proof first, and nothing prints until you approve it in writing.
Order ten, order fifty, order five hundred: 10 pieces is our floor, and for your Shirley crew, bigger packs simply pull the per-piece price down.
File quality is our problem, not yours: vectors are ideal, 300 DPI PNGs work, and weak files get redrawn at no charge.
Deployed addresses are first-class here: APO and FPO ship on the standard timeline, right alongside all 50 states.
More answers on the full FAQ page.
See everything we deliver to Shirley, browse sublimation across Illinois, or read the full sublimation service page. Other services in Shirley: Screen Printing, Embroidery, DTG and DTF Printing, Banners and Signs, Custom Design.
Send the idea, get a free proof in 24 hours, approve it in writing, and pay exactly the published pack price.